Browse all practice questions for the NCCER Introduction to Earthmoving (22201) Practice Test. Search by topic, open any question and review its full explanation, then test yourself in the practice quiz.

NCCER Introduction to Earthmoving (22201) Practice Test course image
More practice questions

These questions are part of the practice quiz. Start practicing

  • ________ are natural or synthetic materials made up of long molecular chains of identical chemical subunits.
  • What is the purpose of a ground protection plan on a jobsite?
  • Which term describes the side view drawing that shows the elevations, depths, and slopes of a proposed project?
  • Which type of soil sample is typically a cylindrical piece obtained from a test boring?
  • Substances that tend to stick together have a(n) ________ property.
  • What is the first step before starting any earthmoving machine?
  • If a foul-smelling fluid seeping out of the ground is noticed while walking the new site before starting work, the operator should know that it ________.
  • Water from rain or snow that flows across the ground surface is referred to as ________.
  • The ________ is the pitch or grade of a road's surface perpendicular to its centerline that helps drain water and improve vehicle stability.
  • A material that is made up of numerous adjoined crystals is described as?
  • Why is proper track or tire condition important for stability on uneven ground?
  • How is the design cut/fill line used to plan earthwork?
  • According to the definition of soil shear strength, soils with higher shear strengths ________.
  • Labels on a site plan that indicate fill activities are typically marked as ________.
  • A(n) ________ is the side view of a proposed construction project that depicts heights, depths, and slopes.
  • What should you do if you hit an unknown underground utility while trenching?
  • The time it takes for equipment to complete a repetitive operation is referred to as ________.
  • Manufactured or natural rock or sand that has a specific size characteristic. Used in foundations and subgrade work is called ________.
  • An important concern to most contractors at work sites is ________.
  • Which instrument is commonly used to check grade and alignment on road projects?
  • How do bulldozers and graders differ in their primary earthmoving roles?
  • Any type of mechanical or electronic analysis of soil to determine its density, moisture content, and other properties is known as ________.
  • Which dumping pattern provides the easiest blending of two materials that do not mix easily, such as clay and sand?
  • Which term refers to the permanent points of known elevation used to determine the grade of a project?
  • Why is maintaining a clean, defined haul route essential?
  • A temporary long, narrow excavation that will be filled in soon?
  • A major site safety concern regarding equipment is the security of equipment, which includes preventing theft and tampering.
  • A clay-like soil that swells with an increase in moisture is referred to as a(n) ________.
  • The line that marks the center of a roadway and separates opposing traffic is called the ________.
  • When preparing a job site for excavation or construction, the removal of objects below the original ground is called ________.
  • Which process shapes the compacted surface to accurate grade and crown specifications?
  • What is a typical cold-weather starting procedure for diesel equipment?
  • Which term describes the maximum stable slope angle of a material before it slides?
  • What is the fundamental difference between “cut” and “fill” in earthmoving?
  • The mobile equipment suitable for loading soil at excavations includes ________.
  • Which combination of tools is commonly used to maintain cross slope during grading?
  • What should you consider when weather is delaying earthmoving work?
  • Water from rain or snow that flows across the ground surface is referred to as ________.
  • Which soil component aids cohesiveness in other soils?
  • How does soil moisture content affect compaction effort?
  • If a machine shows signs of instability on a slope, what is the immediate safe action?
  • Which machine is primarily used to shape and finish surfaces to meet precise elevations and slopes?
  • The classification of soils into different particle sizes is called?
  • Name a practical method to control dust and protect the environment on a jobsite.
  • Which agency requires operators of construction sites to establish sedimentation and erosion control plans for sites of one acre or larger?
  • What should you do if a grader blade becomes hung up on a high point?
  • A material derived from living organisms is referred to as ________ material.
  • In earthmoving terms, what is an embankment?
  • The solid layer of rock underlying the earth's surface is ________.
  • Which term refers to each individual layer of fill used to build up an embankment?
  • Before digging near utilities, what steps should you take?
  • Water that resides or flows below the ground surface is called ________.
  • Which of the following is not a factor in determining the number of soil compaction passes required?
  • Which practice helps ensure accurate cross slope during grading?
  • Samples of earth taken from test borings are ________.
  • A(n) ________ is a specific piece of work that a contractor is paid for.
  • Loose pieces of rock placed on an embankment to prevent erosion are called?
  • Why must operators maintain a safe standoff distance from trenches and unstable slopes?
  • What term describes the water-saturated level of soil where all voids are filled with water?
  • How can you minimize fuel consumption during earthmoving operations?
  • How can you maintain consistent cross slope during road grading?
  • Materials excavated and stockpiled for future use are known as?
  • The soil type that aids cohesiveness in other soil types is ________.
  • What is the most common hazard when working around heavy earthmoving equipment?
  • Which term refers to the measure of water content in compacted soil that affects pliability?
  • How should you handle unstable spoil piles to prevent collapse?
  • Which term describes machines that excavate by dragging a bucket toward the machine by a cable?
  • On a slope, what does the term angle of repose describe?
  • A material described as consisting of numerous adjoined crystals?
  • What factors influence a jobsite’s accessibility for earthmoving equipment?
  • Which statement best describes machine blind spots and a common mitigation?
  • After refueling, what action should be taken regarding spills?
  • ________ are natural or synthetic materials made up of long molecular chains of identical chemical subunits.
  • Removing water from an area using a pump or drain is known as ________.
  • What is the primary purpose of a grade stake on a construction site?
  • Which term describes the natural incline of the ground?
  • What is the term for material piled in a uniform manner to build up an area?
  • The greatest hazard to dealing with raw sewage in an excavation is ________.
  • Layers of soil laid down in a fill area or to build up an embankment are also called ________.
  • The roadway area between the shoulder/hinge point and the bottom of the adjacent ditch or natural grade is called the ________.
  • What is the function of a grade control system on earthmoving equipment?
  • What does 'blade float' mean on a bulldozer blade?
  • If orange flags indicate underground infrastructure, what type of cable is most likely present?
  • What do sump pits collect and remove from a construction site?
  • What is a key safety practice during maintenance to prevent unexpected machine startup?
  • Compaction of a lime-stabilized area requires _______.
  • Waste fill is recycled, treated material approved for use in certain ________.
  • Which of the following best describes the role of grade stakes in field operations?
  • A hole drilled in order to take a sample of material for testing is a(n) ________.
  • Which of the following is a common cause of an uneven finish after grading?
  • What is a critical consideration when planning the sequence of grading operations?
  • Materials that are not derived from living organisms are known as?
  • Which property helps engineers evaluate soil's resistance to sliding along planes?
  • A material derived from living organisms is referred to as ________ material.
  • Any type of rock or soil that was formed from molten or melted rock is a(n) ________.
  • Ground that forms a natural or artificial incline upward or downward is known as a(n) ________.
  • Long, straight piles of placed material used for the purpose of mixing are called ________.
  • What is a common cause of hydraulic hose failure on earthmoving equipment?
  • A material that clumps together under pressure is described as having which property?
  • Bulk wide-area excavations occur mainly for the following except ________.
  • Which statement best describes the tire or track inspection before work?
  • The binder that provides the highest load-bearing capacity is ________.
  • Which practice helps control dust on a jobsite?
  • Which factors must be considered to ensure stability when performing cut-and-fill operations?
  • What is a key consideration of loader loading height when placing material into trucks?
  • Which statement about the logistics of soil compaction is true?
  • When working on a job, the first priority is to perform the job ________.
  • In road design, which term refers to the line separating traffic moving in opposite directions along the center of a road?
  • Which practice helps reduce fuel usage during earthmoving?
  • In geology, what term refers to the solid rock layer beneath the earth's surface?
  • If a slope is described as 3:1 (horizontal:vertical), what is the approximate grade percentage?
  • ________ earth materials are rocks that were originally deposited by wind or moving water.
  • What term is used for the plan-derived surface level that the project aims to achieve?
  • The EPA requires that operators of construction sites that are one acre or larger establish plans to reduce sedimentation, pollution, and ________.
  • When dealing with unstable spoil piles, which practice helps prevent collapse?
  • The operation used to raise ground level by moving and compacting earth is called ________.
  • Which statement best describes the purpose of daily hydraulic system checks?
  • A very cohesive soil includes a large percentage of ________.
  • The primary earthmoving operations are excavation, backfill, and ________.
  • Which factor is most critical to achieving maximum compaction density in soils?
  • How can you manage a stockpile on soft ground to prevent shifting or sinking?
  • To maintain control of slope during excavation, grade stakes are placed by which team?
  • If a material will not allow water to pass through it, the material is considered ________.
  • The type of dump site used to store material for later use is called a(n) ________.
  • When loading material with a scraper, what is essential for maintaining the correct balance?
  • Surveyor's stakes placed at the intersection of a cut or fill slope with the natural ground, instructions include the slope ratio to meet the hinge point of a roadway or other reference point are called ________.
  • Which type of equipment is often used to mix the binders and graded soil before compaction?
  • Why is backing up on steep slopes dangerous and how can you reduce risk?
  • Why are daily checks and service intervals important for hydraulic systems?
  • Soil or other material that meets a specification for size, shape, or other characteristic is called ________ material.
  • What does a compaction test verify for a base layer?
  • What must be considered to ensure stability when performing cut-and-fill operations?
  • How is a design cut/fill line used in earthmoving planning?
  • When verifying design grades in the field, what elevations must you confirm?
  • Which instrument is commonly used to check grade and alignment on road projects?
  • What is a key safety practice when refueling earthmoving equipment?
  • The measure of water content in compacted soil that affects its pliability is called?
  • What does “grade tolerance” refer to?
  • The solid earth layer that underlies the ground soil in the earth's crust is ________.
  • Stakes set by the survey crews are important because they ________.
  • The unique address given to a site that allows police, fire, and other emergency vehicles to find the location easily is called a(n) ________.
  • Manufactured or natural rock or sand that has a specific size characteristic used in foundations and subgrade work is called ________.
  • Which method would not be very effective for controlling stormwater runoff?
  • In earthmoving, an embankment is primarily used to
  • What is the purpose of a spot grade chart on a jobsite?
  • The ________ is the depth at which the soil is saturated with water.
  • What practices help ensure safe entry and exit from heavy equipment?
  • What should an operator know or do if the site plans show that a particularly large tree on the building site needs to be preserved?
  • Materials not derived from living organisms are defined as which term?
  • A line that marks the center of a roadway is called its ________.
  • The process of compacting soil so it becomes rigid is called?
  • What type of fill tends to separate by particle sizes when dumped down a steep slope into a deep depression?
  • What is a common consequence of exceeding the maximum safe dump height during loader operations?
  • Open pit or holes constructed to collect groundwater that are then pumped out mechanically are called ________.
  • The type of equipment best suited for hauling large rock fragments or masses of slate/shale is the _______.
  • Which action is appropriate when excavating near utilities to minimize damage?
  • Which term refers to the area of roadway between the hinge point and the adjacent ditch or natural grade?
  • A string of orange flags in a construction site indicates the presence of an underground ________.
  • Permanent points of known or assumed elevation from which surveyors can establish grade are called ________.
  • How do you read a design cut/fill line on project plans?
  • Which statement best describes trenching equipment?
  • Which equipment is commonly used to load material from stockpiles?
  • A temporary opening in which something, such as a pipe or box culvert, is placed and then covered is a ________.
  • Which term designates markers used to record cut, fill, and grade information along with underground utilities?
  • Why is environmental protection an important consideration in earthmoving?
  • Backhoes, excavators, and trenching machines are the three main classes of equipment used in ________.
  • Which dumping pattern provides the easiest blending of two materials that do not mix easily, such as clay and sand?
  • How is the hydraulic oil level checked on many earthmoving machines?
  • Why is lockout/tagout important during maintenance?
  • Labels that include the letter F and some digits indicate locations for ________.
  • During excavation and fill activities, slope control is handled with grade stakes that are placed by ________.
  • Dewatering is the process of removing water from an area to lower what condition in soils?
  • A temporary long, narrow excavation that will eventually be filled in is called?
  • The area between the bottom of a ditch adjacent to the roadbed and the top of the cut into the existing natural grade is called?
  • An open excavation that usually does not require shoring is classified as a ______.
  • What should you inspect on tires or tracks before starting work?
  • Markers that are used to mark cut, fill, grade information, underground utilities, or other survey points are called ________.
  • For hauling large rock fragments over short distances in excavation work, the vehicle best suited is the ________.
  • The ________ of soil is a measure of its resistance to deforming along planes or sliding.
  • What tool can be used to verify the grade during grading?
  • Which action best describes preventing equipment damage and erosion on a jobsite?
  • Rocks formed when molten material cools and solidifies are classified as ________ rocks.
  • A site needs a number that helps emergency responders reach it quickly. This designation is called a(n) ________.
  • If you encounter an unknown underground utility while trenching, what is the correct immediate action?
  • The return trip of a piece of equipment after it has dumped its load is called?
  • An open excavation that usually does not require shoring is classified as a(n) ________.
  • The surface of a road, channel, or natural ground area required by plans or specifications is referred to as the ________.
  • Cycle time is defined as the length of time it takes to perform a repetitive operation, such as the time it takes for a piece of equipment to ________.
Subscribe

Get the latest from Passetra

You can unsubscribe at any time. Read our privacy policy